Fabrication and installation of compressed air and vacuum system operating 250 robots in an assembly line. Both the Schedule 40 steel pipe and the Schedule 40 PVC pipe was installed approximately sixteen feet above floor level and suspended from the ceiling. The compressed air piping consists of over 400 feet 2″ and 3″ Schedule 40 black pipe with grooved fittings and couplings. The vacuum piping is over 400 feet of 8″ Schedule 40 PVC pipe and fittings.